Energy Storage
-
SCE Reliability Utility-Owned Storage RFP
DESCRIPTION
Seeking Design, Build, Transfer (DBT) contract for the construction of Battery Energy Storage Projects to be sited at SCE owned sub-station sites for up to 712.5 MW by 8/1/2022
-
APS 2020 Battery Energy Storage RFP
DESCRIPTION
Seeking proposals for EPC services for 60 MW, 4-hour duration BESS at APS-owned Solar PV sites
-
SCE Aliso Canyon Energy Storage 2
DESCRIPTION
Energy Storage (In Front of the Meter and Behind the Meter)
Contract Type: PPA
SOLICITATION RESULTS
Number of Contracts Executed: 7
Amount Procured (MW): 195
-
APS 2018 Battery Storage RFP
DESCRIPTION
APS is seeking proposals for EPC contracts for battery energy storage systems to be integrated with existing APS-owned Solar PV facilities. Through the RFP, APS is seeking over 100 MW of BESS capacity.
-
PG&E Local Sub-Area RFO (2018)
DESCRIPTION
Energy Storage
Contract Type: PPA/BOT/EPC
SOLICITATION RESULTS
Number of Contracts Executed: 4
Amount Procured (MW): 567.5
-
NV Enery Renewables RFP (2018)
DESCRIPTION
Energy Storage and/or Solar PV
Contract Type: PPA/BTA
SOLICITATION RESULTS
Number of Contracts Executed: 4
Amount Procured (MW): 1089
-
PG&E Energy Storage RFO (2016)
DESCRIPTION
Energy Storage
Contract Type: PPA/BTA
SOLICITATION RESULTS
Number of Contracts Executed: 7
Amount Procured (MW): 168