PG&E Projects
Energy Storage
2018 - Local Sub-Area Energy Storage RFO
Independent Evaluator.
Through this RFO, PG&E solicited offers for storage resources through 3rd party arrangements, EPC agreement at its Moss Landing sub-station site and BOT agreements in the local sub-area. PG&E executed 4 contracts for 567 MW of storage capacity.
2021-2022 - Mid-Term Reliability RFOs Phase 1
Independent Evaluator.
Solicitation for over 1,600 MW for 2023 and 2024 of eligible system resource adequacy in response to CPUC Rulemaking 20-05-003 via an All-Source Solicitation Process
2020 - System Reliability RFO – Phase 2
Independent Evaluator.
Incremental procurement of system level qualifying Resource Adequacy capacity in the amount of 342 MW to come on line by August 1, 2023.
2016-2017 - Energy Storage RFOs
Independent Evaluator
PG&E is seeking at least 120 MW of storage projects including both transmission and distribution connected projects. PG&E could acquire the output from the project via an ESA or own the project via a PSA.
2014-2015 - Energy Storage RFO
Independent Evaluator
PG&E is seeking approximately 74 MW of storage projects including both transmission and distribution connected projects. PG&E could acquire the output from the project via an ESA or own the project via a PSA.
2020 System Reliability RFO – Phase 1
Independent Evaluator
Incremental procurement of system level qualifying Resource Adequacy capacity in the amount of 716.9 MW to come on line between August 1, 2021 and August 1, 2023
Solar and Storage
2022-2023 - Mid-Term Reliability RFOs – Phase 2 Zero-Emitting; Long-Term Storage
Independent Evaluator
Over 800 MW for 2025 and 400 MW for 2026 of zero-emitting resources and long-term duration storage in response to CPUC Rulemaking 20-05-003
Solar PV
2010-2012 - RFPs for EPC Services for 250 MW of Utility-Owned Photovoltaic Program
Independent Evaluator
IE for three solicitations for EPC contractors to develop and construct utility-owned solar PV facilities at a PG&E site
2014 - Solar PV Program – Power Purchase Agreements – RFO
Independent Evaluator
Up to 58 MW of small scale (up to 20 MW) PV capacity
2012 RFOs – Solar PV Program – Power Purchase Agreements
Independent Evaluator
Up to 50 MW of Solar PV projects secured via a PPA – Year 2 of 5 year program
2010 - RFPs for Utility-Owned Generation & PPAs
Independent Evaluator
RFP for utility-owned generation seeking up to 250 MW of Solar PV projects and RFO for PPA options seeking up to 250 MW of third-party Solar PV projects
Microgrid
2021-2022 - Clean Substation Microgrid Pilot RFO
Independent Evaluator
2019-2020 - Distributed Generation Enabled Microgrid Services RFO
Independent Evaluator
Solicit offers from bidders to procure incremental biomethane to be used a fuel to procure electricity in the event that a project executed from the DGEMS RFO requires methane as a fuel to produce electricity.
2019-2020 - System Reliability RFOs for Distributed Generation Enabled Microgrid Services
Independent Evaluator
Procure energy resources to provide Distributed Generation Enabled Microgrid Services (DGEMS) for PG&E to minimize impacts on customers from Public Safety Power Shutoff events.
Resource Adequacy
2022 - Central Procurement Entity Local RA Solicitation
Independent Evaluator
Solicitation based on Central Procurement function for PG&E based on CPUC Decision 20-06-002
2021 Central Procurement Entity Local RA Solicitation
Independent Evaluator
Solicitation based on Central Procurement function for PG&E based on CPUC Decision 20-06-002
2010 - Intermediate Term RFOs
Independent Evaluator
RFO seeks System Resource Adequacy and Bay Area Local Resource Adequacy for the summer period 2011-2015.
2008-2009 - Intermediate Term RFO
Independent Evaluator
Local Resource Adequacy; Operationally Flexible Resources; QFs, and RPS energy
CHP
2011-2012 - First Solicitation for Combined Heat and Power RFOs
Independent Evaluator
First of three Solicitations for Combined Heat and Power Facilities – for up to 690 MW
2014 - Third Solicitation Combined Heat and Power RFOs
Independent Evaluator
2013 - Second Solicitation for Combined Heat and Power RFOs
Independent Evaluator
Second of three Solicitations for Combined Heat and Power Facilities